Friday , May 17 2024

Repairs to Wawona Tunnel to begin in Yosemite National Park

Repairs to the Wawona Tunnel in Yosemite National Park, located along the Wawona Road/Hwy 41, are scheduled to begin on Sunday, September 8, 2013. Most of the construction will occur inside the tunnel and incremental traffic delays will be instituted during the construction period, which begins September 8 through December 13, 2013. The work is needed to clean and repair the Wawona Tunnel, which includes repairing sections of the tunnel wall, floor, and ceiling, sealing cracks and joints, improving the drainage system, and cleaning the interior of the length of the tunnel. https://www.nps.gov/yose/learn/news/wawonatunnelrepairs13.htm

About NewsPress

Dedicated to going around town and getting in everyone's business!

Check Also

Yosemite Pile Burning in January 2024

Yosemite National Park is experiencing cooler temperatures and precipitation is in the forecast. With these …

Wanna Comment?

Loading Facebook Comments ...

Leave a Reply